Check network switch in OR Room and noted 3 fiber connections present. 2 out of the 3 fiber connections showing no activity. Switch in OR Room is up and running. Check switch located outside the server room and noted switch and UPS were powered off. power on UPS and switch outside server room and confirmed GSC OR and GSC Pro building network connections restored.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Check network switch in OR Room and noted 3 fiber connections present. 2 out of the 3 fiber connections showing no activity. Switch in OR Room is up and running. Check switch located outside the server room and noted switch and UPS were powered off. power on UPS and switch outside server room and confirmed GSC OR and GSC Pro building network connections restored. |