Move Netgear and Brocade switch from server rack to wooden cabinet. Route all network cables into wooden cabinet. Reconnect switches and network cabling. Perform tests with Colin and confirmed network is back up.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Move Netgear and Brocade switch from server rack to wooden cabinet. Route all network cables into wooden cabinet. Reconnect switches and network cabling. Perform tests with Colin and confirmed network is back up. |
Kevin Hsueh
|
05/17/2022 02:30 pm |
05/17/2022 04:30 pm |
02:00
|