Perform site survey for 3 digital signage installs. All 3 install locations have no wooden or metal studs. Spoke to Leo Palace Engineering Team and was advised that there is plywood backing behind the drywall for all install locations.
| |
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
1 |
Perform site survey for 3 digital signage installs. All 3 install locations have no wooden or metal studs. Spoke to Leo Palace Engineering Team and was advised that there is plywood backing behind the drywall for all install locations. |
Kevin Hsueh
|
11/21/2024 01:53 pm |
11/21/2024 03:30 pm |
01:37 |