- Ran 2 CAT6 cables from the Server Room to Indoor Cameras 1 and 2's location.
- Terminated the remote end of the 2 CAT6 cables and connected the 2 indoor cameras.
- Inspected the installation area around Indoor Camera 3's location and the rest of the indoor cameras.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
- Inspected cable path for Indoor Cameras 1 and 2 from Switch 1 to their respective location. |
Sean Bacani
|
02/11/2026 10:00 am |
02/11/2026 12:00 pm |
02:00
|
|
|
2 |
- Ran 2 CAT6 cables from the Server Room to Indoor Cameras 1 and 2's location.
- Terminated the remote end of the 2 CAT6 cables and connected the 2 indoor cameras.
- Inspected the installation area around Indoor Camera 3's location and the rest of the indoor cameras. |
Sean Bacani
|
02/11/2026 01:00 pm |
02/11/2026 04:30 pm |
03:30
|