- Ran 5 CAT6 cables from the Server Room to the starting point of the lab area.
- Prepared 1 of the 5 CAT6 cables for an Indoor Camera installation.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
- Inspected cable path from Server Room to Lab Area
- Prepared 5 CAT6 cables to be run through cable bracket path. |
Sean Bacani
|
02/12/2026 10:00 am |
02/12/2026 12:00 pm |
02:00
|
|
|
2 |
- Ran 5 CAT6 cables from the Server Room to the starting point of the lab area.
- Prepared 1 of the 5 CAT6 cables for an Indoor Camera installation. |
Sean Bacani
|
02/12/2026 01:00 pm |
02/12/2026 04:50 pm |
03:50
|