- Verified Cameras 6, 7, and 8 cables by tone and tracing. Verified all cables for the interior cameras on the left half of the building, cameras 1 - 8 cables.
- Ran 4 CAT6 cables for Cameras 9 - 13. Cameras 9, 10, and 11 successfully ran through. 12 and 13 is still pending due to Judiciary early leave.
- Contractors seen running cables on the exterior rear exit area and on the HVAC area. Power outlet for Switch 2 also seen.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
- Verified Cameras 6, 7, and 8 cables by tone and tracing. Verified all cables for the interior cameras on the left half of the building, cameras 1 - 8 cables.
- Ran 4 CAT6 cables for Cameras 9 - 13. Cameras 9, 10, and 11 successfully ran through. 12 and 13 is still pending due to Judiciary early leave.
- Contractors seen running cables on the exterior rear exit area and on the HVAC area. Power outlet for Switch 2 also seen. |
Sean Bacani
|
02/20/2026 01:00 pm |
02/20/2026 04:30 pm |
03:30
|