- Installed Camera 4 for the Lab Area entrance facing the hallway.
- Installed Camera 5 for the Photo Lab Room.
- Installed Camera 6 for the Latent Fingerprint Room.
- Installed Camera 7 for the Firearms Exam Area.
- Camera 8 for the Firing Range will be continued tomorrow along with the remaining cameras.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
- Drilled a hole for a cable path for Camera 14 at the Vehicle Garage.
- Prepared Cameras 4 - 7 for installation. |
Sean Bacani
|
02/24/2026 10:00 am |
02/24/2026 12:00 pm |
02:00
|
|
|
2 |
- Installed Camera 4 for the Lab Area entrance facing the hallway.
- Installed Camera 5 for the Photo Lab Room.
- Installed Camera 6 for the Latent Fingerprint Room.
- Installed Camera 7 for the Firearms Exam Area.
- Camera 8 for the Firing Range will be continued tomorrow along with the remaining cameras. |
Sean Bacani
|
02/24/2026 01:00 pm |
02/24/2026 04:30 pm |
03:30
|