Installed 2 network port for Christi’s office. Reused cable to terminate two keystones and one voice cable for Christi’s IP phone. Tested ports and cables after terminating and verified with Christi IP phone can call in/out.
Per Christi’s request, checked Joyce’s UPS issue. UPS was on but not plugged to power outlet. Also checked Tim’s printing issue, verified he’s able to print now. Assisted Christi to setup her email on her new phone.
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
| 1 |
Installed 2 network port for Christi’s office. Reused cable to terminate two keystones and one voice cable for Christi’s IP phone. Tested ports and cables after terminating and verified with Christi IP phone can call in/out.
Per Christi’s request, checked Joyce’s UPS issue. UPS was on but not plugged to power outlet. Also checked Tim’s printing issue, verified he’s able to print now. |
Jayson Larot
|
03/29/2023 09:30 am |
03/29/2023 11:51 am |
02:21
|