Checked in with Brett at Level 10 and Nate with Ross Support. Traced power cables that were running from old server UPS and were not the server power cables and monitor power cable and moved them to orange wall outlets per Ross Support's instructions. Ross Support shut down server and gave the okay to power down UPS and install new UPS. Mounted new UPS. Replugged in power cables for server and monitor and plugged in USB console cable and network cable for new UPS. Powered on UPS. Confirmed that server and monitor power on. Confirmed with Ross Support that they are able to remote into the server and see the new UPS installed. Checked out of work order with Level 10 and Ross Support. Uploaded deliverables to Level 10.
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
| 1 |
Checked in with Brett at Level 10 and Nate with Ross Support. Traced power cables that were running from old server UPS and were not the server power cables and monitor power cable and moved them to orange wall outlets per Ross Support's instructions. Ross Support shut down server and gave the okay to power down UPS and install new UPS. Unplugged all cables and old UPS from server rack. Put old UPS in box to be shipped back to Level 10. Mounted new UPS. Replugged power cables for server and monitor and plugged in USB console cable and network cable for new UPS. Powered on UPS. Confirmed that server and monitor power on. Confirmed with Ross Support that they are able to remote into the server and see the new UPS installed. Checked out of work order with Level 10 and Ross Support. Uploaded deliverables to Level 10. |
Bryant Bagiac
|
02/13/2024 06:30 am |
02/13/2024 08:00 am |
01:30
|