Took out old patch panel and installed new one. Terminated the labeled cables into the new patch panel. After, used cable tester to test every port is working properly. Assisted on transferring over GTA lines and cleaning up.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Finished terminating keystones, labeled ports, and screwed them in with a wall plate. Took out old patch panel and installed new one. Terminated the labeled cables into the new patch panel. After, used cable tester to test every port is working properly. |
Jayson Larot
|
10/07/2022 10:30 am |
10/07/2022 12:00 pm |
01:30
|
|
|
2 |
Took out old patch panel and installed new one. Terminated the labeled cables into the new patch panel. After, used cable tester to test every port is working properly. Assisted on transferring over GTA lines and cleaning up. |
Jayson Larot
|
10/07/2022 01:30 pm |
10/07/2022 05:30 pm |
04:00
|