Deliver and install 65" Promethean panel on motorized mobile stand in Pre-K Room, 1st Floor. Could not test panel, US Power cable missing. Will be dropped tomorrow morning. Invoice will be signed and check will be received tomorrow morning. Put DSI asset tag next to serial number.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Assemble motorized mobile stand |
Bryant Bagiac
|
11/16/2023 09:00 am |
11/16/2023 10:30 am |
01:30
|
|
|
2 |
Deliver and install 65" Promethean panel on motorized mobile stand in Pre-K Room, 1st Floor. Could not test panel, US Power cable missing. Will be dropped tomorrow morning. Invoice will be signed and check will be received tomorrow morning. Put DSI asset tag next to serial number. |
Bryant Bagiac
|
11/16/2023 02:32 pm |
11/16/2023 04:31 pm |
01:59
|