Needed to move boxes from the server room to make some room to work. Ran two new network lines over the drop down ceiling. Placed cable raceways and used hacksaw to cut metal piece for cable to run into. Installed a surface mount box and terminated port end of the cables with keystone. Terminated the other end of the cables on the server. Also made patch cables for the workstation and phone, routed them on the table. Cable tested the terminated cables. Tidied up the cables in the server room and placed the boxes back. Cleaned the debris from the installation and threw away the trash.
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
1 |
Needed to move boxes from the server room to make some room to work. Ran two new network lines over the drop down ceiling. Placed cable raceways and used hacksaw to cut metal piece for cable to run into. Installed a surface mount box and terminated port end of the cables with keystone. Terminated the other end of the cables on the server. Also made patch cables for the workstation and phone, routed them on the table. Cable tested the terminated cables. Tidied up the cables in the server room and placed the boxes back. Cleaned the debris from the installation and threw away the trash. |
Jayson Larot
|
05/05/2023 09:10 am |
05/05/2023 12:10 pm |
03:00 |