- Ran 1 CAT6 cable through the plenum spacing and along the cable bracket from Switch 1 to Switch 2.
- Terminated CAT6 cable for the 2 Switches.
- Connected the power cables of AC62 and AC42 to the power strip as well as the network cable.
- Spliced a power cable for the Maglock power supply and connected it to the power strip.
- Connected the POE cables of the 4 AC12s to Switch 1.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
- Inspected cable path from Switch 1 to Switch 2. |
Sean Bacani
|
02/10/2026 11:00 am |
02/10/2026 12:00 pm |
01:00
|
|
|
2 |
- Ran 1 CAT6 cable through the plenum spacing and along the cable bracket from Switch 1 to Switch 2.
- Terminated CAT6 cable for the 2 Switches.
- Connected the power cables of AC62 and AC42 to the power strip as well as the network cable.
- Spliced a power cable for the Maglock power supply and connected it to the power strip.
- Connected the POE cables of the 4 AC12s to Switch 1. |
Sean Bacani
|
02/10/2026 01:00 pm |
02/10/2026 04:00 pm |
03:00
|