Network switches, Patton GW and Metroe Circuit powered off. noted power strip where devices are connected to is not providing power. replace power strip and confirmed all devices power up. Reboot all GSY and MGC servers. test access successfully with staffNetwork switches, Patton GW and Metroe Circuit powered off. noted power strip where devices are connected to is not providing power. replace power strip and confirmed all devices power up. Reboot all GSY and MGC servers. test access successfully with staff
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
| 1 |
Network switches, Patton GW and Metroe Circuit powered off. noted power strip where devices are connected to is not providing power. replace power strip and confirmed all devices power up. Reboot all GSY and MGC servers. test access successfully with staff |
Kevin Hsueh
|
07/20/2020 10:44 am |
07/20/2020 11:30 am |
00:46
|