- Further various testing indicated that Port 1 Reader's port is bad, advise by Verkada Support also mentions same result. Swapped the cables to AC62's Port 1 to enable functing door.
- As per Kevin, an additional AC12 will be mounted and installed as a redundancy ACS while Verkada sends a replacement AC42.
- Toned and Traced the Reader, Exit Button, and Striker for D131C CSI Decon Exterior. Routed from existing cabinet to AC12. Connected the cables to the AC12.
- Mounted and Installed AD34 Reader, Retained Striker and Exit Button. Tested and verified function through Verkada Command. Reader is not showing signs of powering-on, will re-investigate tomorrow.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
- Toned and Traced the Reader, Exit Button, and Striker for D135 Corridor Exterior. Routed from existing cabinet to AC42. Connected the cables to the AC42.
- Mounted and Installed AD34 Reader, Retained Striker and Exit Button. Tested and verified function through Verkada Command. Reader is stuck on booting. |
Sean Bacani
|
04/02/2026 09:30 am |
04/02/2026 12:00 pm |
02:30
|
|
|
2 |
- Further various testing indicated that Port 1 Reader's port is bad, advise by Verkada Support also mentions same result. Swapped the cables to AC62's Port 1 to enable functing door.
- As per Kevin, an additional AC12 will be mounted and installed as a redundancy ACS while Verkada sends a replacement AC42.
- Toned and Traced the Reader, Exit Button, and Striker for D131C CSI Decon Exterior. Routed from existing cabinet to AC12. Connected the cables to the AC12.
- Mounted and Installed AD34 Reader, Retained Striker and Exit Button. Tested and verified function through Verkada Command. Reader is not showing signs of powering-on, will re-investigate tomorrow. |
Sean Bacani
|
04/02/2026 01:00 pm |
04/02/2026 04:30 pm |
03:30
|