W42591   Submitted for Invoicing

04/07/2026, 10:00 am   
Onsite
Normal
JUDC.4005: Judiciary - Access Control Project 2025
Judiciary - Access Control Project 2025 [TOTAL ANNUAL HOURS: 100]
-190
6
Sean Bacani
No

Work Requested

- Judiciary ACS Project.
Work Requested by: Monica Salas

Items Dropped Off 0

Item Serial Number Notes

Work Completed 2

Summary of Tasks

- Tone and traced the Striker for D134A Vehicle Bay Corridor, routed from existing cabinet to AC12, connected and wired it to AC12. - Tested device and Striker is dead. Replaced it with a new one, observed issue with door latch not making proper contact with the new striker, requires extensive grinding of the striker frame. - Swapped the new striker for D131B's retained striker, tested the device and is OK. - Started cable management for the network cables on the server rack and some of the access control cables.
Work Completed Technician Check-in Check-out Actual Hrs
1 - Troubleshooted issue with D131B CSI Decon Vehicle Bay 2nd Reader. Observed power stuttering when enabling In/Out option in Verkada Command in order to enable 2nd Reader, 1st Reader is OK and functions as it should be. - Tried swapping the 2nd Reader with another reader, symptoms still shows the same. Concluded that it might be an issue with either the port for the 2nd Reader itself or with AC12 as a whole. Reported findings to Kevin, he advised that will need to get in with Verkada Support to escalate issue. Sean Bacani
04/07/2026 09:30 am 04/07/2026 12:00 pm 02:30
2 - Tone and traced the Striker for D134A Vehicle Bay Corridor, routed from existing cabinet to AC12, connected and wired it to AC12. - Tested device and Striker is dead. Replaced it with a new one, observed issue with door latch not making proper contact with the new striker, requires extensive grinding of the striker frame. - Swapped the new striker for D131B's retained striker, tested the device and is OK. - Started cable management for the network cables on the server rack and some of the access control cables. Sean Bacani
04/07/2026 01:00 pm 04/07/2026 04:30 pm 03:30

Parts and Materials 0

Item Serial Number Condition Qty Price Amount
TOTAL ($)   0.00

Comments For Internal Use only. 16

Date/Time Comment Tech
04/07/2026 07:51 pm Created workorder. Sean B.
04/07/2026 07:51 pm Assigned: Sean Bacani Sean B.
04/07/2026 07:51 pm Updated status to Scheduled Sean B.
04/07/2026 07:59 pm Check-in 04/07/2026 09:30 am Sean B.
04/07/2026 08:00 pm Arrived 04/07/2026 10:00 am Sean B.
04/07/2026 08:02 pm Updated status to In Progress Sean B.
04/07/2026 08:02 pm Check-out 04/07/2026 12:00 pm Sean B.
04/07/2026 08:04 pm Check-in 04/07/2026 01:00 pm Sean B.
04/07/2026 08:05 pm Updated status to Service Completed Sean B.
04/07/2026 08:05 pm Work Order Tasks Added Sean B.
04/07/2026 08:05 pm Check-out 04/07/2026 04:30 pm Sean B.
04/07/2026 08:08 pm Service Completed Sean B.
04/07/2026 08:08 pm Updated status to Pending Approval Sean B.
04/07/2026 08:08 pm No Signature: - Judiciary ACS Project. Sean B.
04/08/2026 06:31 am Approved. Chu H.
04/08/2026 06:31 am Updated status to Submitted for Invoicing Chu H.

Attachments 1

Filename
W42591