W42595   Submitted for Invoicing

04/08/2026, 10:00 am   
Onsite
Normal
JUDC.4005: Judiciary - Access Control Project 2025
Judiciary - Access Control Project 2025 [TOTAL ANNUAL HOURS: 100]
-190
6
Sean Bacani
No

Work Requested

- Judiciary ACS Project.
Work Requested by: Monica Salas

Items Dropped Off 0

Item Serial Number Notes

Work Completed 2

Summary of Tasks

- Swapped the 2nd Reader cables with the old existing reader's cable, 2nd Reader now operates normally. Concluded that 4 of the 8-strand cables seem to be having issues. - Ran the 8-strand cable that was on the plenum ceiling space of D134A to the internal door frame, installed plastic raceway to hide cables. - Tone and traced the 2nd Reader for D134A Vehicle Bay Corridor, routed from existing cabinet to AC12, connected and wired it to AC12. - Used the 4-strand out of the 8-strand cable for the 1st Reader, spliced and connected the 1st Reader, replaced the existing Exit Button. - Enable In/Out option on the AC12, enabled 2nd Reader. Tested the 2 Readers and Striker, all is functioning OK. Observed rare power stuttering on Reader 2. - Performed Reboots on the AC12s using Verkada Command to attempt stabilizing the connections. - 23/24 Doors fully completed. D100A Main Entrance door is the only one left.
Work Completed Technician Check-in Check-out Actual Hrs
1 - Troubleshooted issues with D131B CSI Decon Vehicle Bay 2nd Reader. Observed power stuttering when enabling In/Out option in Verkada Command in order to enable 2nd Reader, 1st Reader is OK and functions as it should be. Performed various tests to verify function of the AC12. Sean Bacani
04/08/2026 09:30 am 04/08/2026 12:00 pm 02:30
2 - Swapped the 2nd Reader cables with the old existing reader's cable, 2nd Reader now operates normally. Concluded that 4 of the 8-strand cables seem to be having issues. - Ran the 8-strand cable that was on the plenum ceiling space of D134A to the internal door frame, installed plastic raceway to hide cables. - Tone and traced the 2nd Reader for D134A Vehicle Bay Corridor, routed from existing cabinet to AC12, connected and wired it to AC12. - Used the 4-strand out of the 8-strand cable for the 1st Reader, spliced and connected the 1st Reader, replaced the existing Exit Button. - Enable In/Out option on the AC12, enabled 2nd Reader. Tested the 2 Readers and Striker, all is functioning OK. Observed rare power stuttering on Reader 2. - Performed Reboots on the AC12s using Verkada Command to attempt stabilizing the connections. - 23/24 Doors fully completed. D100A Main Entrance door is the only one left. Sean Bacani
04/08/2026 01:00 pm 04/08/2026 04:30 pm 03:30

Parts and Materials 0

Item Serial Number Condition Qty Price Amount
TOTAL ($)   0.00

Comments For Internal Use only. 16

Date/Time Comment Tech
04/08/2026 08:27 pm Created workorder. Sean B.
04/08/2026 08:27 pm Assigned: Sean Bacani Sean B.
04/08/2026 08:27 pm Updated status to Scheduled Sean B.
04/08/2026 08:32 pm Check-in 04/08/2026 09:30 am Sean B.
04/08/2026 08:33 pm Arrived 04/08/2026 10:00 am Sean B.
04/08/2026 08:35 pm Updated status to In Progress Sean B.
04/08/2026 08:35 pm Check-out 04/08/2026 12:00 pm Sean B.
04/08/2026 08:37 pm Check-in 04/08/2026 01:00 pm Sean B.
04/08/2026 08:38 pm Updated status to Service Completed Sean B.
04/08/2026 08:38 pm Work Order Tasks Added Sean B.
04/08/2026 08:38 pm Check-out 04/08/2026 04:30 pm Sean B.
04/08/2026 08:44 pm Service Completed Sean B.
04/08/2026 08:44 pm Updated status to Pending Approval Sean B.
04/08/2026 08:44 pm No Signature: - Judiciary ACS Project. Sean B.
04/10/2026 05:11 pm Approved. Chu H.
04/10/2026 05:11 pm Updated status to Submitted for Invoicing Chu H.

Attachments 1

Filename
W42595