- Mounted and Installed AD34 Reader and Replaced Exit Button, tested and verified through Verkada Command.
- Located cable for Maglock, routed from existing cabinet to the backup AC12. Connected it to the PSU, then routed and connected it to the AC12.
- Tested and verified Maglock engagement, test is OK.
- Tone and traced the Intercom and their old AIPHONE, reused the existing metal box next to the old AIPHONE to hide cables and removed old cables connected to an existing terminal block.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
- Tone and Traced D100A Main Entrance Reader and Exit Button. Routed from existing cabinet to the backup AC12. Connected them to the AC12. |
Sean Bacani
|
04/09/2026 09:30 am |
04/09/2026 12:00 pm |
02:30
|
|
|
2 |
- Mounted and Installed AD34 Reader and Replaced Exit Button, tested and verified through Verkada Command.
- Located cable for Maglock, routed from existing cabinet to the backup AC12. Connected it to the PSU, then routed and connected it to the AC12.
- Tested and verified Maglock engagement, test is OK.
- Tone and traced the Intercom and their old AIPHONE, reused the existing metal box next to the old AIPHONE to hide cables and removed old cables connected to an existing terminal block. |
Sean Bacani
|
04/09/2026 01:00 pm |
04/09/2026 04:30 pm |
03:30
|