W36239   Closed

03/13/2019, 03:30 pm   
Onsite
Normal
DSIG.0097: Warranty Support 2018
Warranty Support [TOTAL ANNUAL HOURS: 2]
2
4
Kevin Hsueh
No

Work Requested

Setup Patton SN4970.
Work Requested by:

Items Dropped Off 0

Item Serial Number Notes

Work Completed 2

Work Completed Technician Check-in Check-out Actual Hrs
1 Deliver and attempt to install Patton SN4970 GW. Gw unable to pull an IP Address. Test with 3 open ports and same issue. Issue due to possible MAC address filtering enabled by Premier One (Title Guaranty off island IT). Dsi to work woth Premier One to resolve issue and install gw Kevin Hsueh
02/27/2019 02:47 pm 02/27/2019 03:50 pm 01:03
2 Noted switch port 50 that was configured by Premier One support is on the other side of the building away from the server room. Connect Patton SN4970 to switch and confirmed 3CX Server can see the Patton SN4970 Gateway (IP: 10.84.200.7). Advised Ryan and was advised Patton Gateway needs to be in the server room. Noted original Patton SN4971 is connected to the Firebox M200 device on Port 5. Connect Patton SN4970 to Firebox M200 Port 3. Sent a separate email to Tyler at Premier One Support advising that port 3 needs to be configured so 3CX Server can see the Patton SN4970 when connected to the Firebox M200. Kevin Hsueh
03/13/2019 03:13 pm 03/13/2019 04:02 pm 00:49

Parts and Materials 0

Item Serial Number Condition Qty Price Amount
TOTAL ($)   0.00

Comments For Internal Use only. 21

Date/Time Comment Tech
03/13/2019 05:59 pm Updated status to Closed Jessica L.
03/13/2019 05:49 pm Updated status to Submitted for Invoicing Chu H.
03/13/2019 05:49 pm Approved. Chu H.
03/13/2019 04:09 pm Updated status to Pending Approval Kevin H.
03/13/2019 04:09 pm Service Completed Kevin H.
03/13/2019 07:05 am Updated billable hours to: 02:00 Kevin H.
03/13/2019 04:04 pm Check-out 03/13/2019 04:02 pm Kevin H.
03/13/2019 04:04 pm Updated status to Service Completed Kevin H.
03/13/2019 03:13 pm Check-in 03/13/2019 03:13 pm Kevin H.
03/13/2019 10:53 am Modified workorder. Kevin H.
03/13/2019 10:53 am Updated scheduled date/time from 02/27/2019 04:00 pm to: 03/13/2019 03:30 pm Kevin H.
03/13/2019 10:53 am Updated Estimated Service Time (hrs) to 4 Kevin H.
02/27/2019 03:51 pm Check-out 02/27/2019 03:50 pm Kevin H.
02/27/2019 03:51 pm Updated status to In Progress Kevin H.
02/27/2019 02:53 pm Arrived 02/27/2019 03:00 pm Kevin H.
02/27/2019 02:47 pm Check-in 02/27/2019 02:47 pm Kevin H.
02/26/2019 03:26 pm Modified workorder. Kevin H.
02/26/2019 03:26 pm Updated scheduled date/time from 02/26/2019 04:00 pm to: 02/27/2019 04:00 pm Kevin H.
02/26/2019 09:52 am Updated status to Scheduled Kevin H.
02/26/2019 09:52 am Assigned: Kevin Hsueh Kevin H.
02/26/2019 09:52 am Created workorder. Kevin H.

Attachments 1

Filename
W36239