Arrive onsite and reassemble HPE ProLiant ML350 G6. Fans, cables, cards, hard drive backplane not connected. Reconnected all devices and cables. Check processors and noted no thermal paste was applied by the last technician. Clean processors and heat sink and apply thermal paste. Boot up server and server boots into VM Ware host. Site POC to work on network and iLo connections. Sent signed RFS to Barrister on a separate email.
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
| 1 |
Arrive onsite and reassemble HPE ProLiant ML350 G6. Fans, cables, cards, hard drive backplane not connected. Reconnected all devices and cables. Check processors and noted no thermal paste was applied by the last technician. Clean processors and heat sink and apply thermal paste. Boot up server and server boots into VM Ware host. Site POC to work on network and iLo connections. Sent signed RFS to Barrister on a separate email. |
Kevin Hsueh
|
10/23/2020 01:00 pm |
10/23/2020 03:00 pm |
02:00
|