Site walkthrough with Black and Otis. Terminate 20 lines (documented and label by Black) to patch panel. relocate existing elevator equipment to the back of the equipment rack. DSI to return tomorrow to deploy 3CX and hardware. test calls to be made for each of the 20 lines at the Annex location once 3CX is up.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Site walkthrough with Black and Otis. Terminate 20 lines (documented and label by Black) to patch panel. relocate existing elevator equipment to the back of the equipment rack. DSI to return tomorrow to deploy 3CX and hardware. test calls to be made for each of the 20 lines at the Annex location once 3CX is up. |
Kevin Hsueh
|
06/14/2021 09:00 am |
06/14/2021 12:00 pm |
03:00
|