W38535   Closed

06/14/2021, 09:00 am   
Onsite
Normal
BLKC.3001: Black Construction - 3CX Project 2021
Black Construction - 3CX Project 2021 [TOTAL ANNUAL HOURS: 30]
30
4
Kevin Hsueh
No

Work Requested

Elevator Project
Work Requested by: GIAA

Items Dropped Off 0

Item Serial Number Notes

Work Completed 1

Summary of Tasks

Site walkthrough with Black and Otis. Terminate 20 lines (documented and label by Black) to patch panel. relocate existing elevator equipment to the back of the equipment rack. DSI to return tomorrow to deploy 3CX and hardware. test calls to be made for each of the 20 lines at the Annex location once 3CX is up.
Work Completed Technician Check-in Check-out Actual Hrs
1 Site walkthrough with Black and Otis. Terminate 20 lines (documented and label by Black) to patch panel. relocate existing elevator equipment to the back of the equipment rack. DSI to return tomorrow to deploy 3CX and hardware. test calls to be made for each of the 20 lines at the Annex location once 3CX is up. Kevin Hsueh
06/14/2021 09:00 am 06/14/2021 12:00 pm 03:00

Parts and Materials 0

Item Serial Number Condition Qty Price Amount
TOTAL ($)   0.00

Comments For Internal Use only. 14

Date/Time Comment Tech
06/14/2021 08:29 am Created workorder. Kevin H.
06/14/2021 08:29 am Assigned: Kevin Hsueh Kevin H.
06/14/2021 08:29 am Updated status to Scheduled Kevin H.
06/14/2021 12:27 pm Check-in 06/14/2021 09:00 am Kevin H.
06/14/2021 12:27 pm Arrived 06/14/2021 09:00 am Kevin H.
06/14/2021 12:30 pm Updated status to Service Completed Kevin H.
06/14/2021 12:30 pm Work Order Tasks Added Kevin H.
06/14/2021 12:30 pm Check-out 06/14/2021 12:00 pm Kevin H.
06/14/2021 12:30 pm Service Completed Kevin H.
06/14/2021 12:30 pm Updated status to Pending Approval Kevin H.
06/14/2021 12:30 pm No Signature: Project Kevin H.
06/14/2021 05:53 pm Approved. Chu H.
06/14/2021 05:53 pm Updated status to Submitted for Invoicing Chu H.
06/15/2021 11:33 am Updated status to Closed Jessica L.