Rack patch panel, grandstream gateway, and equipment shelf. connect patch panel to grandstream gateway and power up 3CX. perform test calls on all 20 elevator lines at the Annex location (on the 50 pair) and confirmed all 20 elevator lines can call the IP Phones.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Rack patch panel, grandstream gateway, and equipment shelf. connect patch panel to grandstream gateway and power up 3CX. perform test calls on all 20 elevator lines at the Annex location (on the 50 pair) and confirmed all 20 elevator lines can call the IP Phones. |
Kevin Hsueh
|
06/15/2021 09:00 am |
06/15/2021 02:00 pm |
05:00
|