Pick up Promethean Loaner Panel and deliver to AIRE office. Arrived onsite and site contact advised Panel is to be stored outside under a tent. Due to weather and physical location conditions, panel was not delivered. Site conditions not ok for Panel. AIRE also advised they were not informed a 65" Panel needs to be stored. AIRE advised they were under the impression the equipment was a foldable board or cardboard.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Pick up Promethean Loaner Panel and deliver to AIRE office. Arrived onsite and site contact advised Panel is to be stored outside under a tent. Due to weather and physical location conditions, panel was not delivered. Site conditions not ok for Panel. AIRE also advised they were not informed a 65" Panel needs to be stored. AIRE advised they were under the impression the equipment was a foldable board or cardboard. |
Kevin Hsueh
|
11/04/2023 08:30 am |
11/04/2023 10:17 am |
01:47
|