Deliver and install Maruson POF1000. Advised Hazel at the front that network will go down while installation takes place. Installed new UPS with network equipment plugged into matching categories as old UPS. Verified internet connection on 3 computers in the front. Left UPS box and old UPS with customer on site. Had customer sign invoice.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Deliver and install Maruson POF1000. Advised Hazel at the front that network will go down while installation takes place. Installed new UPS with network equipment plugged into matching categories as old UPS. Verified internet connection on 3 computers in the front. Left UPS box and old UPS with customer on site. Had customer sign invoice. |
Bryant Bagiac
|
12/27/2023 09:40 am |
12/27/2023 10:35 am |
00:55
|