Run 1 new network cable from server room to exam room. Opened ceiling tile in server room to see where to route network cable through false ceiling. Drilled hole in exam room ceiling to route cable to server room. Fed network cable through false ceiling and through existing hole for cable bundle. Used raceways and coupler to route cable from false ceiling down to junction box. Terminated one cable end for RJ45 and the other for keystone. Made patch cable for connecting keystone to workstation. Tested both patch cable and keystone with cable tester and verified they both passed. Showed Marie work done.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Run 1 new network cable from server room to exam room. Opened ceiling tile in server room to see where to route network cable through false ceiling. Drilled hole in exam room ceiling to route cable to server room. Fed network cable through false ceiling and through existing hole for cable bundle. Used raceways and coupler to route cable from false ceiling down to junction box. Terminated one cable end for RJ45 and the other for keystone. Made patch cable for connecting keystone to workstation. Tested both patch cable and keystone with cable tester and verified they both passed. Showed Marie work done. |
Bryant Bagiac
|
02/08/2024 08:46 am |
02/08/2024 10:05 am |
01:19
|