Added back half of building Cameras to Verkada Command. Configure Camera settings. Updated Floor Plan on Verkada Command.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Register/Add CM42 and CB62 cameras (front half of building) to Verkada Command. Configure and setup camera settings in Verkada Command. Upload GPD Crime Lab Floor Plan to Verkada Command and placed CM42 and CB62 Cameras on Floor Plan. |
Kevin Hsueh
|
03/05/2026 09:30 am |
03/05/2026 11:30 am |
02:00
|
|
|
2 |
Terminate camera network cables at Exit Corridor network patch panel. Connect cameras from back half of the building to switch. |
Kevin Hsueh
|
03/05/2026 02:30 pm |
03/05/2026 04:30 pm |
02:00
|
|
|
3 |
Added back half of building Cameras to Verkada Command. Configure Camera settings. Updated Floor Plan on Verkada Command. |
Kevin Hsueh
|
03/05/2026 06:00 pm |
03/05/2026 07:00 pm |
01:00
|