- Reopened tiles for routing the 2 8-strand cables.
- Wired the 2 8-strand cables to the 2 AC12s for Doors 131B and 134A.
- Ran 2 8-strand cables to the Vehicle Garage entrance.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
- Connected Switch 1 to GPD internet switch. Verified devices turned on and functioning.
- Logged in to Verkada Command through mobile and verified camera feeds with Kevin. Correction made on Camera 5 Serial Number. |
Sean Bacani
|
03/05/2026 09:30 am |
03/05/2026 12:00 pm |
02:30
|
|
|
2 |
- Reopened tiles for routing the 2 8-strand cables.
- Wired the 2 8-strand cables to the 2 AC12s for Doors 131B and 134A.
- Ran 2 8-strand cables to the Vehicle Garage entrance. |
Sean Bacani
|
03/05/2026 01:00 pm |
03/05/2026 04:30 pm |
03:30
|