- Kevin reterminated the cables for Cameras 12 and 16 from the patch panel's side. Issues still persists, Kevin advised he will escalate the issue to Verkada support.
- Inspected cable path for D131B, from corridor restrooms to vehicle bay, impassible passthrough due to the access ceiling tile size on the restroom.
- Rerouted the 8-strand cable to the CSI Exam room, then onto the vehicle bay D131B entrance.
- Routed the other 8-strand cable to the vehicle bay D134A entrance.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
- Constant rebooting observed on Cameras 12 and 16, Camera 11 stuck on update status (Orange LED).
- Verified cable integrity for Cameras 12 and 16 and reterminated their cables on the camera side. |
Sean Bacani
|
03/06/2026 09:30 am |
03/06/2026 12:00 pm |
02:30
|
|
|
2 |
- Kevin reterminated the cables for Cameras 12 and 16 from the patch panel's side. Issues still persists, Kevin advised he will escalate the issue to Verkada support.
- Inspected cable path for D131B, from corridor restrooms to vehicle bay, impassible passthrough due to the access ceiling tile size on the restroom.
- Rerouted the 8-strand cable to the CSI Exam room, then onto the vehicle bay D131B entrance.
- Routed the other 8-strand cable to the vehicle bay D134A entrance. |
Sean Bacani
|
03/06/2026 01:00 pm |
03/06/2026 04:30 pm |
03:30
|